Tips
Charging your clients for a Full Tender Estimate & BOQ
Maybe you have clients who don’t need a preliminary estimate because they’ve proceeded with their architect or designer and have full architectural drawings, engineerings and
Maybe you have clients who don’t need a preliminary estimate because they’ve proceeded with their architect or designer and have full architectural drawings, engineerings and
When I was qualifying leads I’d always get them to pay for a preliminary estimate, I’d go in at about $3,000. After all, you are
I’m sure you would receive plans from clients quite often that are only preliminary plans. As a builder you would naturally think… ’how am I